Astro Intumescent PFP FR Acrylic Sealant (310ml) White

£4.83
Tax included.
Key Features
  • High end formula, certified worldwide.
  • Classified for fire sealing all types of construction and building service penetrations.
  • Very high sound insulation.
  • Low emissions - environmentally and user friendly.
  • Simple to apply with a smooth surface finish.
  • Permanently flexible - will accommodate movement up to 12.5%.
  • No priming necessary for application to most materials.
  • Suitable for most surfaces, included concrete, masonry, steel, gypsum, glass, plastics and most non-porous surfaces.
  • Hardens quickly, tack free after 1 hour (the fire performance specification of the joint filler has been derived when the joint filler has been let to cure for a month).
  • 18 months storage time (under correct conditions). 

Product Description - Designed to prevent the spread of fire and smoke through joints and openings in fire rated walls and floors (including openings formed around building service penetrations); the Astro PFP FR Acrylic will also maintain the acoustic design performance.

When subjected to atmospheric conditions, the sealant cures however, it will retain a degree of elasticity for joint movement. Under fire exposure, The Astro PFP FR Acrylic creates a robust fire seal by the formation of a durable intumescent char.

The Astro PFP FR Acrylic can be used with a suitable filling material i.e. stone wool or Astro PFP FR backing material in order to secure correct width to depth ratio, and to reduce the shrinking of the sealant during curing. Minimum depth and maximum width of the joints are included in the installation instructions.

When testing pipes, one can choose not to cap (or close) the pipe, or cap the pipe inside the furnace, or outside the furnace, or on both sides. The configuration chosen depends on the intended application of the pipe and/or the installation environment.

The code defining if a pipe is capped is stated after the fire classification. For instance, EI 60 C/U which means the pipe was capped inside the furnace, and uncapped outside the furnace. The test configuration defines the approvals possible.

Maintenance
All interested parties, designer, specifier, main contractor and specialist installers should provide access to allow the fire stopping seals to be regularly inspected and maintained, as well as records kept of such maintenance at minimum periods of 12 months, as required by the Regulatory Reform Order, and repaired if necessary. Reference should be made to ASFP TGD 17 – Code of Practice for the Installation and Inspection of Fire Stopping.

Competency
It is vital that those entrusted to design or install a fire stopping product have the necessary levels of competence to undertake the task professionally and thoroughly. The level of competency required will be commensurate with the expected complexity of the building. All designers must eliminate, reduce or control foreseeable risks that may arise during installation, construction or maintenance when preparing or modifying designs. Clients should ensure that the principal designer and principal contractor carry out their duties under CDM regulations. The ASFP foundation course in passive fire protection provides essential knowledge as part of demonstrating competency and understanding in this key fire protection specialism.

Additional Notes
Please refer to the ETA sheet for fields of application for this product. For further information on installation requirements please refer to the manufacturer of the services and the wall/floor specification to ensure the compatibility of this product.

Please ensure that you follow manufacturers guidance and technical notes below.

PRODUCT DATA SHEET.

SAFETY DATA SHEET.

DECLARATION OF PERFORMANCE.

CERTIFICATE OF CONSTANCY OF PERFORMANCE.

TECHNICAL DATA SHEET.

EUROPEAN TECHNICAL ASSESSMENT.

EUROPEAN TECHNICAL ASSESSMENT 2.